T. I Identification: Identify the correct word/s that best describe the following statement.
16. How long is the minimum allowance the conductor in both ends?
17. What will you do next if you already achieved the desired length of the tube?
18. What does it says in step number 8?
19. Why do we need to lay the tube straight forward?
20. In what STEP are we going to insert the connector?
21. "Cut the flexible nonmetallic tubing "belongs to what step number?
22. Prepare the conductor for termination. Strip off at least____of insulation.
23. After laying out the tubing with conductors permanently, what is the next move?
24. What you should do before securing the tubing to the raceway on the indoor unit?
25. What is the first and the last thing to do in installing Flexible Non-metallic
Conduit (PVC) in an electrical installation?
26. Secure the flexible non tallic tubing wrapping it with____.
27. Use guide wires to facilitate easy pulling of conductors. Use_______.
28. gauge____AWG. insert it at one end of the tubing until it reaches the other end of the tubing.
29. after terminating the circuit protection, what will be the next safety measures need to do?
30. after finishing the electrical circuit from indoor to outdoor and unit. now, you are ready for the installation of what
still hoping may mag answer
Answers & Comments
Answer:
16. 150mm
17. Cut
18. Pull the guide wires
19. So that it will be easy to pull the wires
20. Number 13
21. Number 3
22. 5mm
23. Just simply lay the electrical tubing on the patch where the refrigerator system tubing is installed
24. insert the connector
25. prepare the tools and materials / perform housekeeping
Explanation:
PA BRAINLIEST PO