Scenario

A small store owner wants to create his/her own inventory system to track which items are fast
and slow moving. She/he also wants to track the exact number of items/products at the end of the day to
identify items need to purchase. The customer wants to have the system in 25 days, and he/she allotted
only 10, 000 pesos for this project

Directions: Based on the given scenario above create the feasibility study by completing the table below.

Economic
Legal
Operation feasibility
Technical
Schedule

load sa sasagot ng tama need ko napo asap​

example:
Economic P 15,000 budget, yes can finish within the
budget
Legal No need for legal requirement
Operation
feasibility
The system requirements are possible to meet
Technical Need to check computer unit of the store if
capable for system installation
Schedule Need to finish the system within 45 days

Add an Answer


Please enter comments
Please enter your name.
Please enter the correct email address.
You must agree before submitting.

Helpful Social

Copyright © 2024 EHUB.TIPS team's - All rights reserved.