1. NGCP will facilitate Manual Load Dropping (MLD) as contingency measure to avoid overloading the remaining 138kV Transmission Line during the shutdown of Baloi-Aurora 138kV TL for the stringing of the incoming new Lala-Aurora 138kV Line 1 & 2.
2. NGCP will conduct connection works of the energization of ZAMSURECO-I's new 10MVA transformer at Tiguma Substation, Tiguma, Pagadian City.
Affected substation/s:
✔ Upper Bayao Substation
✔ Tiguma Substation
✔ Sta. Maria Substation
✔ Balangasan Substation
✔ San Miguel Substation
Affected areas of:
Entire city of PAGADIAN
Entire municipality of LABANGAN
Entire municipality of TUKURAN
(except Barangays Upper Sambulawan, Laperian, Buenasuerte, and Navalan)
Entire municipality of TIGBAO
Entire municipality of DUMALINAO
Entire municipality of SAN PABLO
Entire municipality of GUIPOS
Entire municipality of SAN MIGUEL
Entire municipality of LAPUYAN
Entire municipality of VINCENZO SAGUN
Entire municipality of MARGOSATUBIG
Entire municipality of DINAS
Entire municipality of DIMATALING
Entire municipality of PITOGO
Entire municipality of TABINA
AURORA
Barangay Lubid
Barangay Lantungan
Barangay Inroad
Barangay Resthouse
Power will be restored without prior notice as soon as the maintenance works are completed. Please take necessary preparations and precautions in anticipation of this scheduled power interruption.
Answers & Comments
Explanation:
‼️ATTENTION‼️
NGCP SCHEDULED POWER INTERRUPTION
Date: October 24, 2021 (Sunday)
Time: 8AM - 5PM
Duration: 9 hours
Reason/s of Interruption:
1. NGCP will facilitate Manual Load Dropping (MLD) as contingency measure to avoid overloading the remaining 138kV Transmission Line during the shutdown of Baloi-Aurora 138kV TL for the stringing of the incoming new Lala-Aurora 138kV Line 1 & 2.
2. NGCP will conduct connection works of the energization of ZAMSURECO-I's new 10MVA transformer at Tiguma Substation, Tiguma, Pagadian City.
Affected substation/s:
✔ Upper Bayao Substation
✔ Tiguma Substation
✔ Sta. Maria Substation
✔ Balangasan Substation
✔ San Miguel Substation
Affected areas of:
Entire city of PAGADIAN
Entire municipality of LABANGAN
Entire municipality of TUKURAN
(except Barangays Upper Sambulawan, Laperian, Buenasuerte, and Navalan)
Entire municipality of TIGBAO
Entire municipality of DUMALINAO
Entire municipality of SAN PABLO
Entire municipality of GUIPOS
Entire municipality of SAN MIGUEL
Entire municipality of LAPUYAN
Entire municipality of VINCENZO SAGUN
Entire municipality of MARGOSATUBIG
Entire municipality of DINAS
Entire municipality of DIMATALING
Entire municipality of PITOGO
Entire municipality of TABINA
AURORA
Barangay Lubid
Barangay Lantungan
Barangay Inroad
Barangay Resthouse
Power will be restored without prior notice as soon as the maintenance works are completed. Please take necessary preparations and precautions in anticipation of this scheduled power interruption.
Please be guided.
Source: ZAMSURECO