Direction: Identify the statements below with the correct terminology by putting a check inside the column across each sentence corresponding to the correct acronym above.

Please be guided with the following full words for the ACRONYMS.

Inspection Plan Header (IPH)
Material-Task List Assignments (MTLA) Inspection Operation (I0)
Inspection Characteristic (IC)
Dependent characteristic specifications (DCS)
Test Equipment (TE)​

Answers & Comments


Add an Answer


Please enter comments
Please enter your name.
Please enter the correct email address.
You must agree before submitting.

Helpful Social

Copyright © 2024 EHUB.TIPS team's - All rights reserved.