Direction: Identify the statements below with the correct terminology by putting a check inside the column across each sentence corresponding to the correct acronym above.
Please be guided with the following full words for the ACRONYMS.
Inspection Plan Header (IPH)
Material-Task List Assignments (MTLA) Inspection Operation (I0)
Inspection Characteristic (IC)
Dependent characteristic specifications (DCS)
Test Equipment (TE)
Answers & Comments
Answer:
1.MTLA
2.IPH
3.IO
4.IC
5.TE